INSTALLATION  |  REPORT OF DISTRIBUTION BOARD ASSEMBLING

REPORT OF DISTRIBUTION BOARD ASSEMBLING FOR SMALL HOUSE

1. Mounting board was installed on work bench and was clearly sanding to make "mirror" surface.

2. All cable channels were cutted very neat and precisely.

3. Mounting board was marked according drawings pack.

4. Mounting board was threaded for bolts to fix DINs. No ugly screws.

5. All cable channels and DINs were fixed by bolts.

6. Pre-assembling to check everything.

7. Neat cable input holes were cutted.

8. Back of mount board was sanding too.

9. All cables were preapared. Insolation was cuted very neat and rounded. No hand writting allowed (temporary shul be clean before work is done).

10. Final assembling. All connection were done only with proper lugs and terminals.

Installation work and assembling - this is Domus Optima enginereeng's fetish. We guarantee the quality! Like in parashuting - every Distribution board assembled by us has personal stamp of our specialist who is resposible for the result. Anyway DomusOptima Engineering is proudly responsible for all our work.


DomusOptimaEngineering